Start free

Plan preparation and check actual output

Inventory forecasting helps plan preparation and purchasing for a shift using sales history and current stock.

3 min read Open this screen in the demo
On this page 10

Plan preparation and check actual output

In the Production tab of Inventory, plan what to produce, how much and when, see work-centre load and material shortages, and keep piece-rate work orders. Stock changes only when you record the output.

Before you start#

The product needs a recipe. Recording output requires the right to edit Inventory; approving work orders requires access to Payroll.

Open Inventory → Production. Sub-tabs: “Orders”, “Capacity load”, “Material needs”, “Piece-rate work orders”, “Work centres”.

Step 1. Add work centres#

Work centres → + Work centre: name (line, oven, section, crew), Hours per day, working days (Mon…Sun buttons) → Save.

Step 2. Create a production order#

Orders → + Production order: product (only products with a recipe), Quantity to produce, Planned date, Work centre and Hours per unit (the time standard; without it the order does not count towards load) → Save.

The orders table shows how much is produced, planned hours and labour from work orders; a yellow mark means labour not yet charged to an output.

Step 3. Check load and material needs#

  • Capacity load: choose “From” and “Days” (7, 14 or 31). Each cell shows planned hours against the work-centre capacity; red means overload. Below are orders without a work centre or time standard and overdue ones.
  • Material needs: raw materials “Required / In stock / Shortage” for open orders of the warehouse and the semi-finished products that must be made. Draft supplier order for the shortage creates a draft in the Procurement tab.

Step 4. Record output#

On an order, click Record output, enter the quantity → Record output. A regular Production document is written (visible in Documents): materials are consumed by the recipe on the output date. If the connection drops, retrying writes the same document, not a second one. The remaining quantity can be closed (“Close order”) or the order cancelled — recorded output stays in stock.

Step 5. Record piece-rate work orders#

Piece-rate work orders → Month → + Work order: “Date of work”, production order, rows “Employee / Operation / Quantity / Rate per unit” → Save draft or Approve.

An approved work order adds a “Piece rate: production” accrual to each employee in the payroll draft of the month of the work date (Payroll → Month, recalculate the draft), and its amount goes into the output of the order as a conversion cost. Once approved, a work order cannot be edited — only cancelled.

Preparation forecast#

Inventory → Forecast helps prepare items and purchases for a shift from sales history and current stock. Choose the location and day, check needs and stock, take open orders into account and create shift tasks or a draft supplier order.

Limitations#

  • Labour from work orders goes into the cost of output only when full production costing is enabled for the account; otherwise the amount is shown in the output and the cost is based on materials.
  • A work order approved after output goes into the next output of the order.
  • A work order can be approved only while the main employer’s payroll month is not approved.
  • A work order in a currency other than the warehouse currency is not added to payroll or output.
  • Plans and work orders are saved from the browser; there is no separate server-side check of write rights for the plan.
  • The forecast does not account for future events unknown to the system.

Troubleshooting#

Symptom What to check
“The product has no recipe” Add the product’s components in Inventory.
An order is not in the load Assign a work centre and “Hours per unit”.
No accrual in payroll Is the work order approved? Recalculate the payroll draft of the work-date month.
The forecast does not look like the expected shift Check the day, sales history, open orders and manual adjustments.
Was this article helpful?