Plan preparation and check actual output
In the Production tab of Inventory, plan what to produce, how much and when, see work-centre load and material shortages, and keep piece-rate work orders. Stock changes only when you record the output.
Before you start#
The product needs a recipe. Recording output requires the right to edit Inventory; approving work orders requires access to Payroll.
Open Inventory → Production. Sub-tabs: “Orders”, “Capacity load”, “Material needs”, “Piece-rate work orders”, “Work centres”.
Step 1. Add work centres#
Work centres → + Work centre: name (line, oven, section, crew), Hours per day, working days (Mon…Sun buttons) → Save.
Step 2. Create a production order#
Orders → + Production order: product (only products with a recipe), Quantity to produce, Planned date, Work centre and Hours per unit (the time standard; without it the order does not count towards load) → Save.
The orders table shows how much is produced, planned hours and labour from work orders; a yellow mark means labour not yet charged to an output.
Step 3. Check load and material needs#
- Capacity load: choose “From” and “Days” (7, 14 or 31). Each cell shows planned hours against the work-centre capacity; red means overload. Below are orders without a work centre or time standard and overdue ones.
- Material needs: raw materials “Required / In stock / Shortage” for open orders of the warehouse and the semi-finished products that must be made. Draft supplier order for the shortage creates a draft in the Procurement tab.
Step 4. Record output#
On an order, click Record output, enter the quantity → Record output. A regular Production document is written (visible in Documents): materials are consumed by the recipe on the output date. If the connection drops, retrying writes the same document, not a second one. The remaining quantity can be closed (“Close order”) or the order cancelled — recorded output stays in stock.
Step 5. Record piece-rate work orders#
Piece-rate work orders → Month → + Work order: “Date of work”, production order, rows “Employee / Operation / Quantity / Rate per unit” → Save draft or Approve.
An approved work order adds a “Piece rate: production” accrual to each employee in the payroll draft of the month of the work date (Payroll → Month, recalculate the draft), and its amount goes into the output of the order as a conversion cost. Once approved, a work order cannot be edited — only cancelled.
Preparation forecast#
Inventory → Forecast helps prepare items and purchases for a shift from sales history and current stock. Choose the location and day, check needs and stock, take open orders into account and create shift tasks or a draft supplier order.
Limitations#
- Labour from work orders goes into the cost of output only when full production costing is enabled for the account; otherwise the amount is shown in the output and the cost is based on materials.
- A work order approved after output goes into the next output of the order.
- A work order can be approved only while the main employer’s payroll month is not approved.
- A work order in a currency other than the warehouse currency is not added to payroll or output.
- Plans and work orders are saved from the browser; there is no separate server-side check of write rights for the plan.
- The forecast does not account for future events unknown to the system.
Troubleshooting#
| Symptom | What to check |
|---|---|
| “The product has no recipe” | Add the product’s components in Inventory. |
| An order is not in the load | Assign a work centre and “Hours per unit”. |
| No accrual in payroll | Is the work order approved? Recalculate the payroll draft of the work-date month. |
| The forecast does not look like the expected shift | Check the day, sales history, open orders and manual adjustments. |