Start free

Shift schedule

Templates, week and month views, 2/2 and multi-shift cycles for up to a year, labor rules, publishing and acknowledgement, availability, time off and shift swaps; schedules for several locations

2 min read Admin panel demo
On this page 10

Shift schedule

This page helps you pick the right guide for building a schedule or working with your own shifts.

A manager plans the schedule in “Staff → Shifts”. An employee sees the published schedule in “My cabinet → Schedule”.

Saving a shift, publishing it and acknowledging it are separate actions. A draft has to be published, and the employee separately confirms that they have read the finished schedule.

Where to go for your task#

Task Guide
Prepare standard shifts, breaks and rest checks Shift templates and working time rules
Fill a week, a month or a cycle; publish and print Build and publish a schedule
See your shifts, share your availability or find a replacement Your schedule and swaps
Turn on owner approval and location rules Approval and cost limit

What you need to get started#

  • Add employees, assign them roles and work locations.
  • For the employee cabinet, give the employee a personal login.
  • Check the time zones and opening hours of your locations.
  • To build a schedule, you need owner or manager access to the right employees and locations.
  • The owner sets up labor rules, acknowledgement and limits.

To tell roles apart by color, set the “Position colour” in “Staff → Roles and access”, in the settings of the role you need.

Limitations#

  • You can't drag shifts with the mouse: to change a shift, open it in the grid.
  • Copying weeks, the weekly cost estimate, printing and emailing work in the week view.
  • Personal hours limits warn about overload but don't block the shift on their own.
  • Rules for minors don't take school timetables into account.
  • A closed timesheet blocks editing shifts for that period.

Owner approval, automatic publishing and employee acknowledgement are set up separately. Their conditions are described in the guides above.

Troubleshooting#

Problem Where to go
You can't fill or publish shifts Check the schedule before publishing
Publishing is waiting for the owner Week approval
Dates are locked Closed month
Shifts further ahead are missing from your phone calendar iCal subscription and its period

FAQ#

Can I fill a whole year at once?#

You can apply a template to a period of up to 366 days, then review and publish the result. See filling cycles.

Why does a 10:00–10:00 shift last 24 hours?#

Identical start and end times mean the shift ends the next day. For a shift from ten in the morning to ten in the evening, set 10:00–22:00.

Does a chat message replace acknowledgement?#

No. The message tells people the schedule has been published. The acknowledgement status appears after the employee acts or after a paper signature is recorded.

Can I ask for a different start time?#

Yes, a future shift in the cabinet has “Ask for another time”. See the employee guide for details.

Was this article helpful?