Shift schedule
This page helps you pick the right guide for building a schedule or working with your own shifts.
A manager plans the schedule in “Staff → Shifts”. An employee sees the published schedule in “My cabinet → Schedule”.
Saving a shift, publishing it and acknowledging it are separate actions. A draft has to be published, and the employee separately confirms that they have read the finished schedule.
Where to go for your task#
| Task | Guide |
|---|---|
| Prepare standard shifts, breaks and rest checks | Shift templates and working time rules |
| Fill a week, a month or a cycle; publish and print | Build and publish a schedule |
| See your shifts, share your availability or find a replacement | Your schedule and swaps |
| Turn on owner approval and location rules | Approval and cost limit |
What you need to get started#
- Add employees, assign them roles and work locations.
- For the employee cabinet, give the employee a personal login.
- Check the time zones and opening hours of your locations.
- To build a schedule, you need owner or manager access to the right employees and locations.
- The owner sets up labor rules, acknowledgement and limits.
To tell roles apart by color, set the “Position colour” in “Staff → Roles and access”, in the settings of the role you need.
Limitations#
- You can't drag shifts with the mouse: to change a shift, open it in the grid.
- Copying weeks, the weekly cost estimate, printing and emailing work in the week view.
- Personal hours limits warn about overload but don't block the shift on their own.
- Rules for minors don't take school timetables into account.
- A closed timesheet blocks editing shifts for that period.
Owner approval, automatic publishing and employee acknowledgement are set up separately. Their conditions are described in the guides above.
Troubleshooting#
| Problem | Where to go |
|---|---|
| You can't fill or publish shifts | Check the schedule before publishing |
| Publishing is waiting for the owner | Week approval |
| Dates are locked | Closed month |
| Shifts further ahead are missing from your phone calendar | iCal subscription and its period |
FAQ#
Can I fill a whole year at once?#
You can apply a template to a period of up to 366 days, then review and publish the result. See filling cycles.
Why does a 10:00–10:00 shift last 24 hours?#
Identical start and end times mean the shift ends the next day. For a shift from ten in the morning to ten in the evening, set 10:00–22:00.
Does a chat message replace acknowledgement?#
No. The message tells people the schedule has been published. The acknowledgement status appears after the employee acts or after a paper signature is recorded.
Can I ask for a different start time?#
Yes, a future shift in the cabinet has “Ask for another time”. See the employee guide for details.