Start free

Build and publish the shift schedule

Fill in a week or month, check conflicts, publish shifts and collect acknowledgements

7 min read Admin panel demo
On this page 17

Build and publish a shift schedule

This article helps you build a schedule, check it and hand the finished schedule over to your employees.

A new shift starts out as a draft. Publishing tells the team about the schedule; each employee confirms acknowledgement separately.

What you need to get started#

  • You need owner or manager access to the schedule and the location.
  • Employees must have roles and work locations assigned.
  • Check the location's time zone and opening hours.
  • For suggestions and cycles, prepare shift templates.

Build a week#

  1. Open “Staff → Shifts”.
  2. Choose the “Week” view.
  3. Select the period you need.
  4. Select the location.
  5. Click an empty cell for the employee on the right day.
  6. In the “New shift” window, pick a template or enter the start and end.
  7. Check the break.
  8. Read the availability and overlap warnings.
  9. Click “Save”.

To change a shift, click it in the grid. If you don't know who will work yet, you can create an “Open shift”: an employee can then take it.

Copy a previous week#

  1. Open the “Copy week” menu.
  2. In the “Copy from” field, pick one of the last six weeks.
  3. Click “Copy week”.
  4. Check the plan that was created and any skipped shifts.

Planned hours are copied, not clock-ins and clock-outs. Matching shifts aren't created a second time.

Staffing need from the forecast#

In the week view, once you select a location, the “Staffing need from the forecast” block appears above the grid. If there isn't enough order history, it shows a message that there is no forecast.

  1. Click “Productivity” in this block.
  2. Choose a role.
  3. Set the “Driver”: revenue, checks or guests.
  4. Set the “Per person per hour” rate and “Min. people”.
  5. Click “Save”.
  6. Compare the “need” and “scheduled” figures for the busy hours.

For example, a rate of 12 guests per person per hour helps you estimate how many people you need when the forecast is 36 guests. This is a planning estimate — check it before you publish.

Suggest a schedule from templates#

  1. In the forecast block, click “Suggest a week”.
  2. If needed, enter the expected revenue and the “Target labor %”.
  3. Click “Suggest”.
  4. Review the candidates, unfilled shifts and warnings.
  5. Click “Apply as draft”.

Suggestions take templates, roles, availability and absences into account. Preferred hours are picked before “On call” hours. If no suitable people are found, see the exclusion reasons in the window.

The button sits in the forecast block, not in the “More” menu. This block isn't shown in the month view.

Schedule shifts for a month or a year#

  1. In “Staff → Shifts”, open “More → Shift templates”.
  2. Click “Apply” next to a template.
  3. Select employees.
  4. Set a date range of no more than 366 days.
  5. Choose a method in the “How to place shifts” block.
  6. Check the preview calendar.
  7. Click “Apply”.
Method Which schedule it suits
By weekday For example, Monday, Wednesday and Friday
N on / M off 2/2, 3/3, 5/2 or your own cycle with a first working day
Even / odd dates Working by calendar dates
A cycle of several shifts Day, night and days off in a set order

For 24 hours on, three days off, choose the 1/3 cycle and a 24-hour template, for example 08:00–08:00. To alternate day and night shifts, use a sequence like D-D-N-N-O-O.

If teams work the same cycle with an offset, add them with the “+ Another crew” button. Check each crew's dates in the preview.

Existing shifts aren't replaced. Matching intervals are skipped, while a different interval can become a second shift on the same day. So check for overlaps after applying.

If the connection drops, apply again with the same settings: matching shifts that were already created will be skipped.

To see the whole month, switch the grid to the “Month” view.

Check the schedule before publishing#

  1. Compare the planned hours and the week's cost estimate with your budget.
  2. Check the summary of labor rule violations above the grid.
  3. Check people's availability and shift overlaps.
  4. Look through the warnings about shifts outside the location's opening hours.
  5. Check the acknowledgement deadline warning if one appears.

Labor rules check the rest between shifts, the shift length and the number of working days in a row. Depending on their mode, they can warn you or block saving.

If “Do not publish a schedule with conflicts” is on, availability violations can stop publishing. An employee's personal hours limits show a warning and don't block publishing on their own.

A clock icon marks a shift that starts more than two hours before the location opens or ends more than two hours after it closes. This is a warning, not a block on publishing.

For locations in Russia, the interface also warns when a schedule is communicated late. Check the deadline shown; this warning doesn't disable the button.

Publish the schedule and collect acknowledgements#

  1. Select the location and period you need.
  2. Click “Publish week” or “Publish month”, depending on the grid view.
  3. Read the review window.
  4. Confirm publishing.

On a narrow screen, the main button label shortens to “Publish”. The affected employees get a notification in the work chat.

If publishing requires owner approval, use schedule approval.

Collect read confirmations#

The owner turns on “Ask employees to acknowledge the schedule when it is published” in “Settings → Shifts and clock-in”. The same place has “Remind after, hours”; 0 turns reminders off.

  1. Open the week you need.
  2. Choose “More → Acknowledgement”.
  3. If the schedule was published before the setting was turned on, click “Request acknowledgement for this week”.
  4. Check the statuses in the list.
  5. For someone who signed a paper schedule, click “Signed on paper”.

In the grid, ✓ means acknowledged, the eye icon means waiting for a response, and ↻ means the schedule changed after the response. In the last case, the employee needs to acknowledge it again.

Publish automatically by a deadline#

  1. The owner opens “Staff → Settings → Shifts and clock-in”.
  2. In the “Publish the schedule automatically” block, they turn on “Publish the week by a deadline”.
  3. They set “Days before Monday”.
  4. They set “Time (location time zone)”.
  5. They click “Save”.

The check runs every half hour. The result appears in “Recent automatic publishes”.

A week that hasn't been approved or a strict-check conflict postpones publishing. Retries continue until the week starts. Drafts added after a successful automatic publish have to be published manually.

  1. In the week view, select the location you need.
  2. Open “More → Print”.
  3. Check the sheet: unpublished shifts are marked as drafts.
  4. Click “Print”.

To send it by email, first publish all shifts of the week.

  1. In the print window, click “Email to staff”.
  2. Confirm with the “Send” button.
  3. Check the result: employees without an email address are listed separately.

You can send it again after 10 minutes. The printed sheet is A4 landscape.

Limitations#

  • Printing, emailing and forecast-based suggestions are available in the week view.
  • Applying templates creates drafts; you have to publish them separately.
  • A closed timesheet blocks creating and editing shifts on closed dates.
  • Automatic publishing may skip shifts without a location; you can see them in the log.

Troubleshooting#

Problem Solution
There is no forecast block Select a week and a specific location; check your permissions
Suggestions found no people Check templates, roles, leave and availability
Publishing was rejected Read the reason: a conflict, a closed timesheet or waiting for approval
An employee didn't get the email Check the email address in their card and the mailing result

FAQ#

Can I publish a whole month at once?#

Yes. Switch the grid to “Month” and use the publish button for that period.

Does an employee see a draft as the finished schedule?#

“My schedule” and the calendar subscription show published shifts. Finish publishing before handing the schedule over to the team.

Was this article helpful?